We have recently completed a range of joinery work and alterations to the Holy Trinity Church in Blacon, this included the manufacture and fitting of the following:
• Angled freestanding church Alter rails with cross members for feet allowing for the rails to be moveable.
• Plinths and handrail extensions for the church Pulpit and Lectern.
• Reduction in the width of the High Alter using old timber to match the existing timber.
• Kitchenette front servery manufactured using solid oak with a templated and panelled arch with 4 folding doors and an inner worktop in black gloss laminate.
• Solid oak side entrance stable door to the Kitchenette.
The work has now been completed and the images below show the high specification of workmanship that has gone into this project.
If you have an ecclesiastical project that needs bespoke work and completing to the highest possible of standards, give us a call on 01244 371571 or get in touch with us here.